Design and test of position sensing front end circuits for inertial sensor of gravitational wave detector, flight electronics (12 A4 size electronic PCBs) launched in 2015 within LISA technology package on LISA Pathfinder mission, successfully operated at L1 point during 18 months.
Phase A and B1 development of the same functional modules for the LISA (Laser Interferometric Space Antenna) mission. (2021-2023)